Yerkes Neuroscience Research Facility

The new Yerkes primate research facility at Emory University consists of a new 5-story, 91,256 SF research laboratory building which houses vivarium spaces for several species, cage washing, laboratories (both wet and electronic), testing, administrative and support spaces. The project was designed to achieve LEED certification.

All of the labs are air conditioned and achieve pressurization control through the use of manifolded variable volume supply and exhaust systems using Phoenix air valves. Labs contain a mixture of biosafety cabinets and fume
hoods.

KLG Jones provided full commissioning services to support the LEED certification and the requirements of the Owner’s commissioning program. Services included design reviews, commissioning specifications, a commissioning plan, pre-commissioning checklists, functional performance testing, final commissioning, Owner’s training and final documentation.

Systems commissioned include HVAC, plumbing, electrical, fire alarm, and security systems. Systems included chillers, cooling towers, steam and hot water boilers, energy recovery custom air-handling systems, laboratory systems, fume hoods, VAV lab exhaust systems, VAV terminals, pumps, HEPA filtration unit, fire pump and controller, emergency generator and automatic transfer switchgear.

Architect: O’neal Inc.
Location: Atlanta, Georgia
Project Size: 91,256 sq. ft.
Construction Cost: $21 Million
Systems Commissioned: HVAC, Central Plant, Electrical, Emergency Power
Laboratory exhaust systems, Pressurization control, Fire Alarm and Security.

Laboratories: « Back to Laboratories

Untitled Document
South Carolina
218 Trade Street
Suite E
Greer, SC 29651
864.848.6116

North Carolina
212 South Tryon Street
Suite 1680
Charlotte, NC 28281
704.573.0063

Georgia
2126 Defoors Ferry Rd. NW
Atlanta, GA 30318
866.439.6116

Untitled Document