The commissioning process has become a critical mainstay in today’s new construction environment, primarily because owners are tired of being handed buildings that don’t work.

KLG Jones focuses on key issues such as energy efficiency, maintainability and occupant comfort. Our experience includes underfloor air distribution systems, which require a great deal of coordination during the construction phase, thermal storage systems, data/telecom, emergency power, controls, fire alarm, smoke control and security systems.

...........................................................................................................................................................................

KLG Jones provides expert commissioning services for the following critical systems:

  • HVAC
  • Control Systems
  • Data/Telecomm
  • Electrical
  • Fire Alarm
  • Lighting
  • Plumbing
  • Security
  • Smoke Control
....................................................................................................................................................................................................................................
 
Case Studies

 

HUBBELL LIGHTING HEADQUARTERS
Greenville, SC

Photo of Hubble Lighting Headquarters in Greenville, SC

Architect: McMillan Smith & Partners Architects
Location: Greenville, South Carolina
Project Size: 180,000 square feet
Construction Cost: $27 Million

KLG Jones was selected to provide full commissioning services for the new LEED certified corporate headquarters and research facility for Hubbell Lighting. The new facility houses the engineering, marketing, planning, sales, financial, credit and administrative functions for the company. Space types include development laboratories, offices, auditorium, and display space.

Commissioning services were provided to fulfill the LEED Energy and Atmosphere prerequisite as well as the enhanced commissioning credit point. The services include full design development and construction document review, commissioning specifications, commissioning plan, construction inspection, shop drawing review, pre-commissioning check lists, functional performance testing, failure mode testing, owner’s training, system documentation and warranty walkthrough.

Systems commissioned include the central utility plant, air handling units, VAV terminals, exhaust fans, variable frequency drives, emergency generators, Liebert computer room air conditioning units, UPS systems, distribution transformers, outdoor lighting, and the building automation system. The project was earned a LEED Gold certification.

CAROLINA FIRST CORPORATE CAMPUS
Greenville, SC

Photo of Carolina First Corporate Campus in Greenville, SC

Architect: Cooper Cary
Location: Greenville, South Carolina
Project Size: Two Office Buildings and Conference Center
Construction Cost: $50 Million

KLG Jones provided full commissioning services for the new LEED certified corporate headquarters campus for Carolina First in Greenville, SC. When complete the campus will contain four office buildings totaling 350,000 square feet and a large conference center. Commissioning services were provided to fulfill the LEED Energy and Atmosphere prerequisite as well as well as the enhanced  commissioning credit point.

The services include full design development and construction document review, commissioning specifications, commissioning plan, construction inspection, shop drawing review, pre-commissioning check lists, functional performance testing, Owner’s training, system documentation and warranty walkthrough. Systems commissioned include the central utility plant, air handling units, VAV terminals, exhaust fans, variable frequency drives, emergency generators, Liebert computer room air conditioning units, distribution transformers, outdoor lighting, and the building automation system.